Approvals

Process

Architectural approvals will be done  on a committee basis, referred to as “consultant” throughout the design guideline manual.   Owners are responsible for keeping their sites clean and tidy throughout the entire construction process.

Design Review

One full size (24”X36”) and two 11”X17” hard copies must be submitted for review.   Hand drawings will not be accepted.  A copy of the submission package in PDF format is also required.

Subscribe to RSS - Approvals